$24m Aquatic development including a new indoor warm water pool, outdoor waterplay area and 50m outdoor competition pool with carpark extension. CJCE were appointed to complete the civil/structural and aquatic design documentation for the facility including all pool structures, pool hydraulics, plantroom layouts, footing design, at ground and below ground stormwater drainage, steel frame design and carpark design.
The Project commenced construction early 2019.
Architect: dwp (design world partnership)
Services Consultant: Umow Lai
Contractor: BROWNS